The project includes installation of a 7-km long water pipeline, construction of a pond with a capacity of holding 50 cubic meters and 2 water distribution stations, as well as solar-energy generating device.
Reports also indicated that there are plans to renovate the wells in Karura, Alakieb, Ashagen and Dige. A pond has been constructed in Agrae and the installation of water pipelines is underway. The inhabitants of the localities used to drink water that was not up to standard.